About Us

History

  • 1962: Orville Buskerud founds Buskerud Construction as “roadside development” for national highway system
  • Ownership transitions from Buskerud family to Sweetman Construction Company to current owner Kari Karst
  • 2009: Buskerud Construction acquired Terin Corporation for expansion into concrete paving
  • November 10, 2012: Buskerud Construction becomes BX Civil & Construction
    • In order to fully unify our team to realize our vision for the next 50 years, we decided that changing our “brand” would signal to our employees, our customers, our community and our industry that we believe what we do matters.
  • We are proud of our history and proud of who we are today
    • We respect and honor the Buskerud name by retaining the “B” in BXCC
    • “X” in BX stands for “EXCELLENT”
    • We signal unification of our past, present and future by retaining the black, white and green coloring

Project Delivery Methods

  • Traditional Design-Bid-Build
  • Design Build
  • Construction Management
    • Agency
    • At Risk

Project Examples

Dell Rapids Recreational Trails

Bridge Rehab and Pavement Repair – I-229/I-90 Interchange

8th Street Utility and Reconstruction

Recent Project Awards

2011 AGC Build Award – Dell Rapids Recreational Trail

2011 SDRMCA Excellence in Concrete – Dell Rapids Recreational Trail

2012 AGC Build Award – I-229 Bridge Rehab and Pavement Repair

2012 ACPA Excellence in Concrete Pavement Resoration – I-229 Bridge Rehab and Pavement Repair

2012 SDRMCA Excellence in Concrete – 8th Street Utility and Reconstruction

Project Experience

  • South Dakota, Minnesota, Nebraska, and Iowa Departments of Transportations
  • Corps of Engineers on dam systems, flood control and airports
  • Various City and County projects
    • Freeman, SD
    • Sioux Falls, SD
    • Dell Rapids, SD
  • Consistently meet difficult time constraints
  • Experience and professionalism with project inspectors

BX Civil & Construction is certified as a WBE/DBE by South Dakota DOT and Minnesota DOT.

___________________________________________

Dell Rapids Recreational Trails

Included:

  • 8000 feet of 8 foot wide concrete trail
  • Abutments and placement of prefabricated pedestrian bridge over Big Sioux River

Challenges:

  • Preserve natural beauty and aesthetics
  • Blend trail with historic sites and location

Awards:

  • 2011 AGC Build SD Award
  • 2011 SDRMCA Excellence in Concrete Award

___________________________________________

Bridge Rehab and Pavement Repair – I-229/I-90 Interchange – Sioux Falls, SD

Included:

  • Epoxy bridge deck overlays – innovative two part epoxy bridge deck chip seal
  • Joint modification
  • Pavement repairs

Challenges:

  • Overnight work hours
  • Keep high traffic bridges open using lane closure traffic control

Awards:

  • 2012 AGC Build SD Award
  • 2012 ACPA Excellence in Concrete Pavement Restoration

___________________________________________

8th Street Utility and Reconstruction – Sioux Falls, SD

Included:

  • Removal of existing surfacing
  • Replacement of existing water, sewer, and storm sewer utilities
  • Concrete resurfacing
  • Replacement of alley concrete

Challenges:

  • Historic building confinements
  • Existing parking ramps and other obstacles

Awards:

  • 2012 SDRMCA Excellence in Concrete Award

Contact Us
P.O. Box 187
24663 - 475th Avenue
Dell Rapids, SD 57022
Phone: (605) 428-5483
Fax: (605) 428-5484
email@bx-cc.com
Estimating
AliceAnn Krantz, VP Estimating
Phone: (605) 428-5483 Ext. 201
Fax: (605) 428-5484
estimating@bx-cc.com